573 km Heavy Haul Line with 32,4 tons Axle Load

  • 815 km Track length - UIC 60 Rails on Heavy Haul Concrete Sleepers with Pandrol Fast Clip 
     
  •  Procurement of 99.600 ton of Rails and 212 Turnouts to be installed on pre-stressed Concrete Sleepers
     
  • Material Production of 1.620 km Long Welded Rails  / 3,6 Mio tons Ballast  / 1,3 Mio pcs of Concrete Sleepers using production facilities installed and operated on site (yards, queries, plants)

33 km computerized, driverless Metro System on Viaduct 

  • Automatic People Mover System, including Building Management System, Railway Management System, Automatic Track Control  
     
  • Telecommunication, Signalling and Safety Management System
     
  • Installed on an Infrastructure of 11.245 m viaduct, 5520 m Slab Track (Depot), 28.028 m running Track,
    48 Turnouts and 27.630 m Third Rail
     
  • To operate 22 driverless Trains, on four lines with 14 Stations to convey up to 15.000 people per hour
    (ultimate demand)