815 km Track length - UIC 60 Rails on Heavy Haul Concrete Sleepers with Pandrol Fast Clip
Procurement of 99.600 ton of Rails and 212 Turnouts to be installed on pre-stressed Concrete Sleepers
Material Production of 1.620 km Long Welded Rails / 3,6 Mio tons Ballast / 1,3 Mio pcs of Concrete Sleepers using production facilities installed and operated on site (yards,
queries, plants)
33 km computerized, driverless Metro System on Viaduct
Automatic People Mover System, including Building Management System, Railway Management System, Automatic Track Control
Telecommunication, Signalling and Safety Management System
Installed on an Infrastructure of 11.245 m viaduct, 5520 m Slab Track (Depot), 28.028 m running Track,
48 Turnouts and 27.630 m Third Rail
To operate 22 driverless Trains, on four lines with 14 Stations to convey up to 15.000 people per hour
(ultimate demand)